鋁單板是適用于多種生活工作場所,如:寫字樓、機場、地鐵、輕軌、車站、展館、醫院、行政辦公大樓,商業樓等各種場所,符合環保要求。那么鋁單板的施工準備注意什么呢?
Aluminum veneer is suitable for a variety of living and working places, such as office buildings, airports, subways, light rails, stations, exhibition halls, hospitals, administrative office buildings, commercial buildings and other places, in line with environmental protection requirements. So what should be paid attention to in the construction preparation of aluminum veneer?
1、詳細核查該施工圖紙和現場實測尺寸,以確保深化設計加工的完善,同時認真與結構節點圖進行核對,發現其不相符的部位,盡早修正設計。
1. Check the construction drawings and on-site measured dimensions in detail to ensure the perfection of deepening design and processing. At the same time, carefully check with the structural node drawing, and correct the design as soon as possible if it is found to be inconsistent.
2、檢查橫豎龍骨的質量是否符合圖紙要求。橫豎龍骨安裝符合設計規范要求。橫豎龍骨安裝的連接螺栓不可漏裝。為了保證板的安裝精度,宜用經緯儀對橫梁豎框桿件進行貫通,變形縫、沉降縫、變截面處等應妥善處理,使其滿足使用要求。
2. Check whether the quality of horizontal and vertical keels meets the requirements of the drawing. The installation of horizontal and vertical keels shall meet the requirements of design specifications. The connecting bolts for horizontal and vertical keel installation shall not be omitted. In order to ensure the installation accuracy of the plate, it is advisable to use a theodolite to connect the beam and mullion members, and the deformation joints, settlement joints, and variable cross-sections should be properly handled to meet the use requirements.
3、金屬連接件材質及加工幾何尺寸必須符合設計要求,材質必須有出廠合格證及復試報告。
3. The material and processing geometric dimensions of metal connectors must meet the design requirements, and the material must have factory certificate and retest report.
4、連接件與豎龍骨的連接要可靠,不要漏放彈墊。
4. The connection between the connector and the vertical keel should be reliable, and the spring pad should not be missed.
5、鋁板生產廠家建議您對鋁板材質、板面色澤、強度、外觀、加工精度等進行檢查,看是否符合設計及國家標準。
5. The aluminum plate manufacturer recommends that you check the aluminum plate material, surface color, strength, appearance, processing accuracy, etc. to see whether it meets the design and national standards.
(1)檢查鋁板的長寬尺寸偏差、對角線尺寸差、對邊平行度偏差等加工精度:聯合世紀鋁單板的各項加工精度要求均按遠高于國家標準的本企業標準執行。
(1) Check the processing accuracy of aluminum plate, such as length and width dimension deviation, diagonal dimension difference, and opposite side parallelism deviation: all processing accuracy requirements of Lianhe century aluminum veneer are implemented in accordance with the enterprise standard that is much higher than the national standard.
(2)檢查鋁板板面的平整度:板面平整用3M靠尺檢查,允許偏差3Mm。板面垂直、水平用3M靠尺檢查,允許偏差2.5mm,陰陽角用方尺檢查,允許偏差2.5mm。
(2) Check the flatness of the aluminum plate surface: the flatness of the plate surface is checked with 3M guiding rule, and the allowable deviation is 3mm. The vertical and horizontal of the plate surface shall be checked with 3M guiding rule, and the allowable deviation is 2.5mm. The internal and external corners shall be checked with square rule, and the allowable deviation is 2.5mm.
(3)檢查鋁板的折邊角度及多折形板的角度偏差:要在±0.50以內,鋁板折邊的圓角半徑符合設計規定,折邊一次成型。
(3) Check the folding angle of aluminum plate and the angle deviation of multi folded plate: it should be within ± 0.50, the fillet radius of aluminum plate folding should meet the design requirements, and the folding should be formed at one time.
(4)板折邊上的鉚接掛耳的位置正確。
(4) The riveting lug on the folded edge of the plate is in the correct position.
(5)所提供的加工成型板表面不得有明顯壓痕,印痕和凹陷等殘跡,板面無損傷,無隱傷及斑紋。
(5) The surface of the processing and forming plate provided shall be free of obvious indentation, impression, depression and other residues, and the plate surface shall be free of damage, hidden injury and speckle.
(6)肋板與鋁板背連接所用植釘,在植釘完成后鋁板表面不應有明顯凸起、凹陷和涂層表面不得產生影響觀感的現象,固定牢固。
(6) The planting nails used for connecting the rib plate and the back of the aluminum plate shall be firmly fixed without obvious bulges, depressions and coating on the surface of the aluminum plate after the planting nails are completed.
(7)鋁板應按設計圖要求進行標記。
(7) The aluminum plate shall be marked according to the requirements of the design drawing.
6、板材進場,按規格編號堆放,防止碰撞及污染。
6. When entering the site, the plates shall be stacked according to the specification number to prevent collision and pollution.
安裝施工前要搭設腳手架,安裝操作的吊籃請有關部門進行驗收。檢查腳手架是否符合幕墻施工及規范要求。更多相關內容就來我們網站http://m.speif.com進行咨詢了解吧。
Before installation and construction, scaffolds shall be erected, and the hanging baskets for installation and operation shall be checked and accepted by relevant departments. Check whether the scaffold meets the requirements of curtain wall construction and specifications. Come to our website for more relevant content http://m.speif.com Consult and understand.